Publication Date | Project Title | Type of Government Notice | Government Notice | Related Gazette Plan (Note) |
---|---|---|---|---|
28 December 2012 | PWP Item No. 339DS − North District Sewerage Stage 1 Phase 2C and Stage 2 Phase 1 (Part) − Village Sewerage Works in Ping Kong, Sheung Shui, New Territories | Creation of Rights of Temporary Occupation of Land under Roads (Works, Use and Compensation) Ordinance (Cap. 370) as applied by section 26 of the Water Pollution Control (Sewerage) Regulation (Chapter 358 Subsidiary Legislation) | G.N. 8296 | DNM2212c |
28 December 2012 | PWP Item No. 339DS − North District Sewerage Stage 1 Phase 2C and Stage 2 Phase 1 (Part) − Village Sewerage Works in Ping Kong, Sheung Shui, New Territories | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Chapter 370) as applied by section 26 of the Water Pollution Control (Sewerage) Regulation (Chapter 358 Subsidiary Legislation) | G.N. 8295 | DNM2211d |
23 November 2012 | Public Works Programme Item No. 469CL Kai Tak Development - Infrastructure at North Apron Area of Kai Tak Airport - Stage 4 Infrastructure Works Reconstruction of Existing Seawall near To Kwa Wan Typhoon Shelter | Authorization under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 7561 | KM8773 |
16 November 2012 | PWP Item No. 4353DS Outlying Islands Sewerage Stage 2 – Stage 2 – Upgrading of Mui Wo Village Sewerage Phase 2 and Mui Wo Sewage Treatment Works (Wang Tong and Mui Wo Centre) Corrigendum | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Chapter 370) as Applied by Section 26 of the Water Pollution Control (Sewerage) Regulation (Chapter 358 Subsidiary Legislation) | G.N. 7481 | ISM1659h_1
(Sheet 1 of 2) & ISM1659h_2 (Sheet 2 of 2) |
9 November 2012 | Proposed Construction Works of a Platform for The Hong Kong Federation of Youth Groups Jockey Club Sai Kung Outdoor Training Camp at Tai Mong Tsai, Sai Kung, New Territories | Authorization under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 7284 | SKM7947b |
9 November 2012 | Providing Sufficient Water Depth for Kwai Tsing Container Basin and its Approach Channel | Authorization under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 7283 | KTM1492a |
2 November 2012 | PWP Item No. 4125DS - Tolo Harbour Sewerage of Unsewered Areas Stage I Phase IIC - Village Sewerage at San Tau Kok, Po Sam Pai and Lai Pek Shan San Tsuen, Tai Po | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Cap. 370) as applied by section 26 of the Water Pollution Control (Sewerage) Regulation (Chapter 358 Subsidiary Legislation) | G.N. 7126 | TPM4819b_1
(Sheet 1 of 2) & TPM4819b_2 (Sheet 2 of 2) |
5 October 2012 | Development of a Bathing Beach at Lung Mei, Tai Po | Authorization under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 6605 | TPM4654 |
21 September 2012 | Proposed External Lift at Shek Kip –Mass Transit Railway ('MTR') Station Improvement Works | Road Closure and Alteration under Mass Transit Railway (Land Resumption And Related Provisions) Ordinance (Chapter 276) | G.N. 6328 | KM8192a |
21 September 2012 and 28 September 2012 | Mass Transit Railway (‘MTR’) South Island Line (East) | Resumption of Land under Railways Ordinance (Chapter 519) | G.N. 6265 | RDM1472 |
14 September 2012 | Liantang / Heung Yuen Wai Boundary Control Point and Associated Works | Acquisition of Land under the Land Acquisition (Possessory title) Ordinance (Chapter 130) | G.N. 6108 | DNM2595a_1
(Sheet 1 of 9) & DNM2595a_2 (Sheet 2 of 9) & DNM2595a_3 (Sheet 3 of 9) & DNM2595a_4 (Sheet 4 of 9) & DNM2595a_5 (Sheet 5 of 9) & DNM2595a_6 (Sheet 6 of 9) & DNM2595a_7 (Sheet 7 of 9) & DNM2595a_8 (Sheet 8 of 9) DNM2595a_9 (Sheet 9 of 9 |
14 September 2012 | Liantang / Heung Yuen Wai Boundary Control Point and Associated Works | Notice of Intention to make an order under the Public Health and Municipal Services Ordinance (Chapter 132) directing the removal and disposal of human remains from graves/ urns | G.N. 6059 | DNM2596b_1
(Sheet 1 of 11) & DNM2596b_2 (Sheet 2 of 11) & DNM2596b_3 (Sheet 3 of 11) & DNM2596b_4 (Sheet 4 of 11) & DNM2596b_5 (Sheet 5 of 11) & DNM2596b_6 (Sheet 6 of 11) & DNM2596b_7 (Sheet 7 of 11) & DNM2596b_8 (Sheet 8 of 11) DNM2596b_9 (Sheet 9 of 11) DNM2596b_10 (Sheet 10 of 11) DNM2596b_11 (Sheet 11 of 11) |
24 August 2012 | PWP Item No. 4339DS(Part) - North District Sewerage, Stage 2 Phase 1 Village Sewerage at Tai Wo and Kau Lung Hang Lo Wai, Tai Po | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Cap. 370) as applied by section 26 of the Water Pollution Control (Sewerage) Regulation (Chapter 358 Subsidiary Legislation) | G.N. 5636 | TPM5127b |
17 August 2012 and 24 August 2012 | Proposed Construction Works of a platform for the Hong Kong Federation of Youth Groups Jockey Club Sai Kung Outdoor Training Camp at Tai Mong Tsai, Sai Kung, New Territories | Notification under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 5544 | SKM7947b |
17 August 2012 | PWP Item No. 4353DS Outlying Islands Sewerage Stage 2 - Upgrading of Mui Wo Village Sewerage Phase 2 and Mui Wo Sewage Treatment Works (Wang Tong and Mui Wo Centre) | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Chapter 370) as Applied by Section 26 of the Water Pollution Control (Sewerage) Regulation (Chapter 358 Subsidiary Legislation) | G.N. 5477 | ISM1659g_1
(Sheet 1 of 2) & ISM1659g_2 (Sheet 2 of 2) |
10 August 2012 and 17 August 2012 | PWP Item No. 469CL - Kai Tak Development Infrastructure at North Apron Area of Kai Tak Airport - Stage 4 Infrastructure Works Reconstruction of Existing Seawall near To Kwa Wan Typhoon Shelter | Notification under Foreshore and Sea-bed (Reclamations) Ordinance (Cap. 127) | G.N. 5388 | KM8773 |
3 August 2012 | Resumption of Land for Implementation of Development Scheme MK/01 by the Urban Renewal Authority at Shanghai Road / Argyle Street, Mong kok, Kowloon | Resumption of Land under Lands Resumption Ordinance (Cap. 124) | G.N. 5234
& G.N. 5235 | KM8762
& KM8763 |
3 August 2012 | Shatin to Central Link | Creation of Rights of Temporary Occupation of Land under Railways Ordinance (Chapter 519) | G.N. 5182 | RDM1423 |
27 July 2012 and 3 August 2012 | Providing Sufficient Water Depth For Kwai Tsing Container Basin and Its Approach Channel | Notification under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 5059 | KTM1492a |
20 July 2012 | PWP Item No. 4332DS - Lam Tsuen Valley Sewerage - Village Sewerage at Fong Ma Po, Chung Uk Tsuen, San Uk Tsai, Tong Sheung Tsuen and She Shan, Tai Po | Creation of Rights of Temporary Occupation of Land under Roads (Works, Use and Compensation) Ordinance (Cap. 370) as applied by section 26 of the Water Pollution Control (Sewerage) Regulation (Cap. 358 Subsidiary Legislation) | G.N. 4851 | TPM5061b |
20 July 2012 | PWP Item No. 4332DS - Lam Tsuen Valley Sewerage - Village Sewerage at Fong Ma Po, Chung Uk Tsuen, San Uk Tsai, Tong Sheung Tsuen and She Shan, Tai Po | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Cap. 370) as applied by section 26 of the Water Pollution Control (Sewerage) Regulation (Cap. 358 Subsidiary Legislation) | G.N. 4850 | TPM5060d |
29 June 2012 | Development of a Bathing Beach at Lung Mei, Tai Po | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Cap. 370) | G.N. 4421 | TPM4661b |
29 June 2012 | PWP Item No. 4272DS - Port Shelter Sewerage, Stage 2, Package B, Sewerage at Wo Tong Kong, San Uk, Nam Shan, Sha Kok Mei and Kap Pin Long | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Chapter 370) as applied by section 26 of the Water Pollution Control (Sewerage) Regulation (Chapter 358 Subsidiary Legislation) | G.N. 4420 | SKM7144c |
22 June 2012 | Development of a Bathing Beach at Lung Mei, Tai Po | Resumption of Land under Lands Resumption Ordinance (Chapter 124) | G.N. 4321 | TPM4553b |
22 June 2012 | Proposed Asia Submarine-Cable Express from Tseung Kwan O to the Eastern Boundary of the Hong Kong Special Administrative Region Waters | Authorization under Foreshore and Sea-bed (Reclamations) Ordinance (Cap. 127) | G.N. 4315 | SKM8022a |
22 June 2012 | Liantang / Heung Yuen Wai Boundary Control Point and Associated Works | Creation of Easements and Other Permanent Rights under Roads (Works, Use and Compensation) Ordinance (Cap. 370) | G.N. 4235 | DNM2357b_1
(Sheet 1 of 3) & DNM2357b_2 (Sheet 2 of 3) & DNM2357b_3 (Sheet 3 of 3) |
22 June 2012 | Liantang / Heung Yuen Wai Boundary Control Point and Associated Works | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Cap. 370) | G.N. 4234 | DNM2356c_1
(Sheet 1 of 16) & DNM2356c_2 (Sheet 2 of 16) & DNM2356c_3 (Sheet 3 of 16) & DNM2356c_4 (Sheet 4 of 16) & DNM2356c_5 (Sheet 5 of 16) & DNM2356c_6 (Sheet 6 of 16) & DNM2356c_7 (Sheet 7 of 16) & DNM2356c_8 (Sheet 8 of 16) & DNM2356c_9 (Sheet 9 of 16) & DNM2356c_10 (Sheet 10 of 16) & DNM2356c_11 (Sheet 11 of 16) & DNM2356c_12 (Sheet 12 of 16) & DNM2356c_13 (Sheet 13 of 16) & DNM2356c_14 (Sheet 14 of 16) & DNM2356c_15 (Sheet 15 of 16) & DNM2356c_16 (Sheet 16 of 16) |
15 June 2012 | Resumption of Land for Implementation of Development Project MTK/1/002 by the Urban Renewal Authority at San Shan Road / Pau Chung Street, Ma Tau Kok, Kowloon | Resumption of Land under Lands Resumption Ordinance (Cap. 124) | G.N. 4130 | KM8729 |
8 June 2012 | Proposed External Lift at Sai Wan Ho Station –Mass Transit Railway ('MTR') Station Improvement Works | Road Closure and Alteration under Mass Transit Railway (Land Resumption And Related Provisions) Ordinance (Chapter 276) | G.N. 3930
& G.N. 3931 | HKM9265 |
1 June 2012 | Construction of a Landing and Access Facility at Che Lei Pai Beacon, Tolo Channel, Tai Po | Authorization under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 3746 | TPM5441b |
4 May 2012 | PWP Item No. 7710CL Hung Shui Kiu Development, Stage 2 – Widening of Tin Ha Road and Tan Kwai Tsuen Road (Portion for Tan Kwai Tsuen Road) | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Cap. 370) | G.N. 2976 | YLM7677a |
4 May 2012 | Improvement of Kam Pok Road – Man Yuen Chuen Section | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Cap. 370) | G.N. 2975 | YLM7579b |
27 April 2012 | PWP Item No. 834TH Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities | Creation of Easements and Other Permanent Rights and Rights of Temporary Occupation of Land under Roads (Works, Use and Compensation) Ordinance (Cap. 370) | G.N. 2764 | ISM1734b-I
& ISM1732b-I (Sheet 1 of 3) & ISM1732b-I (Sheet 2 of 3) & ISM1732b-I (Sheet 3 of 3) |
27 April 2012 | PWP Item No. 844TH Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road | Creation of Easements and Other Permanent Rights and Rights of Temporary Occupation of Land under Roads (Works, Use and Compensation) Ordinance (Cap. 370) | G.N. 2763 | ISM1742a
(Sheet 1 of 3) & ISM1742a (Sheet 2 of 3) & ISM1742a (Sheet 3 of 3) & ISM1757a (Sheet 1 of 5) & ISM1757a (Sheet 2 of 5) & ISM1757a (Sheet 3 of 5) & ISM1757a (Sheet 4 of 5) & ISM1757a (Sheet 5 of 5) |
27 April 2012 | PWP Item No. 834TH Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Cap. 370) | G.N. 2762 | ISM1731a-I
(Sheet 1 of 2) & ISM1731a-I (Sheet 2 of 2) |
27 April 2012 | PWP Item No. 844TH Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Cap. 370) | G.N. 2761 | ISM1741a
(Sheet 1 of 3) & ISM1741a (Sheet 2 of 3) & ISM1741a (Sheet 3 of 3) |
27 April 2012 | PWP Item No. 4345DS – North District Sewerage Stage 2 Part 2A (PART) – Village Sewerage In Sheung Tam Shui Hang and Ha Tam Shui Hang, Sha Tau Kok, New Territories | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Chapter 370) as applied by section 26 of the Water Pollution Control (Sewerage) Regulation (Chapter 358 Subsidiary Legislation) | G.N. 2760 | DNM2273a |
20 April 2012 | PWP Item No. 4272DS Port Shelter Sewerage, Stage 2, Package C, Sewerage at Tai Ping Tsuen and Tai Shui Tseng | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Chapter 370) as applied by section 26 of the Water Pollution Control (Sewerage) Regulation (Chapter 358 Subsidiary Legislation) | G.N. 2547 | SKM7138b |
20 April 2012 | Proposed South-East Asia Japan Cable System From Sha Shek Tan at Chung Hom Kok to Eastern Boundary of the Hong Kong Special Administrative Region | Authorization under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 2639 | HKM9274 |
13 April 2012 | PWP Item no.4274DS Yuen Long and Kam Tin Sewerage Stage 3-Village Sewerage at Tai Tong Tsuen, Yuen Long | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Chapter 370) as applied by section 26 of the Water Pollution Control (Sewerage) Regulation (Chapter 358 Subsidiary Legislation) | G.N. 2370 | YLM7710a |
23 March 2012 | PWP Item No. 5177DR - Dredging and Reclamation to the South-western Coast of Shek Kwu Chau for the Integrated Waste Management Facilities Phase 1 (IWMF – PHASE 1) | Authorization under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 1901 | ISM2069b |
16 March 2012 and 23 March 2012 | Proposed Asia Submarine - Cable Express from Tseung Kwan O to The Eastern Boundary of The Hong Kong Special Administrative Region Waters | Notification under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 1679 | SKM8022a |
2 March 2012 and 9 March 2012 | Mass Transit Railway (‘MTR’) Kwun Tong Line Extension | Resumption of Underground Strata of Land under Railways Ordinance (Chapter 519) | G.N. 1298 | RDM1344
& RDM1345 |
2 March 2012 | Resumption of Land for Implementation of the First Phase of the Kwun Tong Town Centre – Main Site Development Scheme by the Urban Renewal Authority at Kwun Tong, Kowloon | Resumption of Land under Lands Resumption Ordinance (Chapter 124) | G.N. 1296
& G.N. 1297 | KM8645
(Sheet 1 of 2) & KM8645 (Sheet 2 of 2) & KM8646 |
2 March 2012 | Shoreline Stabilisation Works at Butterfly Beach, Tuen Mun | Authorization under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 1295 | TMM3354 |
2 March 2012 | PWP Item no.4274DS - Yuen Long and Kam Tin Sewerage Stage 3-Village Sewerage at Nam Pin Wai, Sai Pin Wai and Ying Lung Wai, Yuen Long | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Chapter 370) as applied by section 26 of the Water Pollution Control (Sewerage) Regulation (Chapter 358 Subsidiary Legislation) | G.N. 1152 | YLM7402b
(Sheet 1 of 2) & YLM7402b (Sheet 2 of 2) |
24 February 2012 | Proposed External Lift at Prince Edward Station –Mass Transit Railway ('MTR') Station Improvement Works | Road Closure and Alteration under Mass Transit Railway (Land Resumption And Related Provisions) Ordinance (Chapter 276) | G.N. 1058
& G.N. 1059 | KM8606 |
24 February 2012 | Proposed External Lift at Lai Chi Kok Station –Mass Transit Railway ('MTR') Station Improvement Works | Road Closure and Alteration under Mass Transit Railway (Land Resumption And Related Provisions) Ordinance (Chapter 276) | G.N. 1056
& G.N. 1057 | KM8320 |
17 February 2012 and 24 February 2012 | Construction of a Landing and Access Facility at To Tau Tsui Beacon, TOLO Channel, Tai Po | Notification under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 878 | TPM5446b |
17 February 2012 and 24 February 2012 | Construction of a Landing and Access Facility at Fung Wong Wat Beacon, TOLO Channel, Tai Po | Notification under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 877 | TPM5450b |
17 February 2012 | PWP Item no. 5013GB - Regulation of Shenzhen River Stage 4 – Ancillary Road Works | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Chapter 370) | G.N. 790 | DNM2375a
(Sheet 1 of 6) & DNM2375a (Sheet 2 of 6) & DNM2375a (Sheet 3 of 6) & DNM2375a (Sheet 4 of 6) & DNM2375a (Sheet 5 of 6) & DNM2375a (Sheet 6 of 6) |
17 February 2012 | Mass Transit Railway (‘MTR’) South Island Line (East) | Resumption of Underground Strata of Land under Railways Ordinance (Chapter 519) | G.N. 788 | RDM1351
(Sheet 1 of 3) & RDM1351 (Sheet 2 of 3) & RDM1351 (Sheet 3 of 3) |
10 February 2012 | Regulation of Shenzhen River Stage 4 – River Channel Works | Resumption of Land under Lands Resumption Ordinance (Chapter 124) | G.N. 703 | DNM2374
(Sheet 1 of 6) & DNM2374 (Sheet 2 of 6) & DNM2374 (Sheet 3 of 6) & DNM2374 (Sheet 4 of 6) & DNM2374 (Sheet 5 of 6) & DNM2374 (Sheet 6 of 6) |
27 January 2012 | Improvement Works to the Public Landing Facility at Trio Beach, Sai Kung | Authorization under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 454 | SKM7637 |
20 January 2012 and 27 January 2012 | Proposed South-East Asia Japan Cable System from Sha Shek Tan at Chung Hom Kok to Eastern Boundary of the Hong Kong Special Administrative Region | Notification under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 341 | HKM9274 |
20 January 2012 and 27 January 2012 | Construction of a Landing and Access Facility at Che Lei Pai Beacon, TOLO Channel, Tai Po | Notification under Foreshore and Sea-bed (Reclamations) Ordinance (Chapter 127) | G.N. 340 | TPM5441b |
20 January 2012 | PWP Item no. 4345DS – North District Sewerage Stage 2 Part 2A (PART) – Village Sewerage in Shan Tsui, Sha Tau Kok, New Territories | Resumption of Land under Roads (Works, Use and Compensation) Ordinance (Chapter 370) as applied by section 26 of the Water Pollution Control (Sewerage) Regulation (Chapter 358 Subsidiary Legislation) | G.N. 280 | DNM2266a |